Posted inFeature, Roads and Infrastructure, Thora

Changed traffic conditions on Waterfall Way at Thora

Motorists are advised of changed traffic conditions next week on a one-kilometre section of Waterfall Way, west of Thora, as four culvert crossings are replaced.

Work will begin on Monday 1 June and is scheduled to continue until Saturday 11 July, weather permitting.

Work hours will be:

  • 7am to 6pm, Monday to Friday
  • 8am to 5pm on Saturdays, when required

No work will be carried out on Sundays or public holidays.

Single-lane, alternating traffic arrangements will be in place during the works, with a reduced speed limit of 60km/h operating during work hours to ensure the safety of workers and road users.

Motorists should allow up to five minutes of additional travel time, drive to the conditions and follow the directions of traffic controllers and signage.

Transport for NSW thanks motorists for their patience during the works.

For more information, visit https://www.livetraffic.com/incident-details/274430, download the Live Traffic NSW app or call 132 701.

To receive updates directly to your phone, search for “Thora” in the Live Traffic app, select the incident and click “Follow”.


Don’t miss any of the important stories from around the region. Subscribe to our email list.